| Key | Summary | Status | Project | Created |
|---|---|---|---|---|
| EUV-3895 | Implement Header design concept including it's payload | Backlog | EUV | 2026. 9. 18. |
| EUV-3944 | [HRS UI] Safety monitoring P&ID Screen 및 Web-Sim dashboard | Peer Review | EUV | 2026. 10. 13. |
| EUV-3717 | [HRS Module Impl] CHrsController - 16-State 메인 상태머신 및 시스템 오케스트레이션 설계 | Done | EUV | 2026. 6. 6. |
| EUV-3936 | run project using codesys 4 | Done | EUV | 2026. 10. 8. |
| PSSM-569 | [EOB] Microsoft Entra ID 앱 권한 추가 요청 (Mail.Read, Files.Read.All, Sites.Read.All) | Backlog | PSSM | 2026. 10. 16. |
| PSSM-568 | [EOB] Microsoft Graph API 추가 권한 요청 — Mail.Read, Chat.Read, OnlineMeetingTranscript | Backlog | PSSM | 2026. 10. 16. |
| PSSM-428 | Request to change alarm status onthe EdCentra | Backlog | PSSM | 2026. 4. 1. |
| PSSM-532 | ASML Gen3 system H2 MFM - make this setting to be configurable in the HMI settings (similar to Gen 2 system in EUV-2482) | Backlog | PSSM | 2026. 6. 24. |
| EUV-3924 | Improve Web sim | In Progress | EUV | 2026. 10. 6. |
| EUV-3722 | Vizeon-Added latched alarm to H2D-LH | In Progress | EUV | 2026. 6. 9. |
| EUV-3945 | Tumalo: RB slice MB fail does not close gate valve; verify Return to Use | QA | EUV | 2026. 10. 14. |
| EUV-3869 | Vizeon Phase2 - EDP Gate Valve (FV-115 / FV-116) alert 및 IO 제거 | Ready for Sign-Off | EUV | 2026. 9. 1. |
| EUV-3934 | Tumalo: Create Terafab Tooltype and recipes | Ready for Sign-Off | EUV | 2026. 10. 8. |
| EUV-3946 | [HRS UI] Product P&ID Screen 생성 및 e2e 테스트 | In Progress | EUV | 2026. 10. 14. |
| EUV-3921 | [HRS UI] Inlet P&ID screen 생성 및 e2e 테스트 | Ready for Sign-Off | EUV | 2026. 10. 2. |
| PSSM-567 | BK9050 Watchdog Delay Value Automatically Changed to 0 When KS2000 and Ethernet Are Connected Simultaneously | Backlog | PSSM | 2026. 10. 7. |
| EUV-3763 | Phase 1 - Script-based porting + on-hardware validation | Refined | EUV | 2026. 6. 30. |
| PSSM-565 | Nova extract low warning 발생 issue | In Staging | PSSM | 2026. 9. 28. |
| PSSM-543 | Proteus HMI crash issue | Backlog | PSSM | 2026. 7. 13. |
| EUV-3831 | Bundle 3.11.1 [ASML,TSMC] | To Do | EUV | 2026. 8. 11. |
| EUV-3847 | OQC Edge Package Installer / Update Agent Requirements | Refined | EUV | 2026. 8. 24. |
| EUV-3881 | Revision Management | Ready for Sign-Off | EUV | 2026. 9. 7. |
| EUV-3890 | Ensure section headers do not count to total progress count | Ready for Sign-Off | EUV | 2026. 9. 15. |
| EUV-3889 | Report Generation Ovehaul | Ready for Sign-Off | EUV | 2026. 9. 11. |
| EUV-3906 | Optimize Modbus resistor usage | In Progress | EUV | 2026. 9. 23. |
| ASP-322 | Deliverable | Backlog | ASP | 2026. 9. 29. |
| ASP-321 | Validation Test | Backlog | ASP | 2026. 9. 29. |
| ASP-299 | PW05-09 - 2차 설계 | In Progress | ASP | 2026. 8. 25. |
| ASP-320 | PW05-07 | In Progress | ASP | 2026. 9. 29. |
| ASP-319 | [REQ-2026-74] TEL Korea_TTCK-Y 향 Protron New Variant | In Progress | ASP | 2026. 9. 29. |
| PSSM-555 | ASML GEN3 5J Upgrade Project의 Valve류 IO 추가 관련 문의사항 | Done | PSSM | 2026. 8. 20. |
| PSSM-557 | Adding reset button in Hot swap procedure | Ready for Sign-Off | PSSM | 2026. 9. 1. |
| PSSM-559 | EUV6550H alarm 발생시 EUV SW logic 관련 질문건 | In Progress | PSSM | 2026. 9. 9. |
| EUV-3829 | TSMC nova to H2D-T upgrade pjt | Ready for Sign-Off | EUV | 2026. 8. 11. |
| EUV-3828 | ASML Wafer test rig PJT | Ready for Sign-Off | EUV | 2026. 8. 11. |
| ASP-314 | [407154] LPLN TOP150 Dual 2차 설계 | In Progress | ASP | 2026. 9. 28. |
| EUV-3351 | Analyze FT&CC and Modbus Mapfile → Gherkin test structure for NKB943000 | Done | EUV | 2026. 2. 10. |
| EUV-3943 | EVIA 설계 리뷰 지적 사항 정리 (워밍업 타임아웃, 모드 전환 등) | Backlog | EUV | 2026. 10. 11. |
| EUV-3942 | EVIA SAMOS 통신 감시 (쓰기 정지 감지, fail-safe CAT0) | Backlog | EUV | 2026. 10. 11. |
| EUV-3941 | EVIA UK 오픈 질문 확정 (BLOCKING 7건, 레시피 Q-76 포함) | Backlog | EUV | 2026. 10. 11. |
| EUV-3347 | As a developer create role and permission matrix | Done | EUV | 2026. 2. 6. |
| EUV-3940 | EVIA 첫 Abingdon 실기 배포와 검증 사이클 | Backlog | EUV | 2026. 10. 11. |
| ASP-91 | One page testable visulization | Completed | ASP | 2025. 1. 15. |
| EUV-3939 | EVIA 필드 IO 바인딩 (Phase 3.2, HW_Abingdon) | Backlog | EUV | 2026. 10. 11. |
| ASP-90 | Link Interfaces among all modules and module have its own simulation mode | Completed | ASP | 2025. 1. 15. |
| ASP-69 | Design CabinetController | Completed | ASP | 2024. 12. 5. |
| ASP-51 | Design TowerLamp | Completed | ASP | 2024. 11. 5. |
| ASP-54 | Try to communicate Protron Project in Abingdon <-> Proface HMI via CodeSys Ethernet V3 | Completed | ASP | 2024. 11. 7. |
| ASP-42 | Create Basic Structure of Protron and Bind all IO | Completed | ASP | 2024. 11. 5. |
| ASP-33 | Extend IO Card config to GenIO and extend CIO Manager to 8slots | Completed | ASP | 2024. 10. 23. |
Atlassian 연결 상태를 확인하는 중입니다.